Check out these photos from a job we are doing at lake Jocassee. We finished up the electrical in one of the few structures that will be built on the shores of lake Jocassee. Now we are installing systems around the grounds and even on the docks. We have to transport our tools and materials using a Tram that goes up and down the steep mountainside on rails.
- Matt the logistics pro
- new subpanel

